Pre-Kindergarten Progress Report (4 and 5 year olds), Pack of 10

Closed measure 5" x 8"
$4.20
Qty:
  • Availability:
    82 In Stock
  • Model:
    H-PRC12
  • Manufacturer: Hayes Publishing Hayes Publishing
  • Description

    Pre-Kindergarten Progress Reports designed for 4 and 5 year olds provide a detailed listing of achievements in various curriculum areas.

    Colorful, easy-to-read reports help parents appreciate the progress their children have made. Areas include self-reliance skills, practical skills, social and emotional skills, work habits, listening and speaking skills, fine motor skills, gross motor skills, reading and math readiness and music, art, science, and social studies readiness skills. Reports are 2 sided, full-color tri-fold sheets. Closed reports measure 5" x 8". Each pack includes 10 reports.

    Features

    • Reports are 2 sided, full-color tri-fold sheets
    • Closed measure 5" x 8"
    • 10 per set

    Specifications

    • This multi color product is made of or contains paper.
    • Product size: 5" x 8"
    • Recommended for children 4-5 years old in Grade PK-K
    • Package contains: 10 reports
    • Country of origin: CHN